- Coordinate all trades working in the plant room through daily briefings and sequencing plans
- Plan equipment delivery routes and lifting operations before mobilising heavy items to site
- Ensure mechanical ventilation is running before hot works or solvent use inside plant rooms
- Wear hearing protection in plant rooms where noise levels exceed 85 dB(A) during operation
- Guard or cover all floor penetrations to prevent falls and trips throughout construction
- Use hot works permits and fire watches for all brazing, welding, and cutting activities
- Maintain clear escape routes from the plant room to the nearest exit at all times
- Brief all personnel on electrical isolation zones during commissioning and energisation
- Keep the plant room clean and free from combustible waste during all construction phases
- Use temporary lighting to ensure adequate visibility in enclosed or windowless plant rooms
|
- DON'T allow multiple uncoordinated trades to work in the same plant room simultaneously
- DON'T carry out hot works in enclosed plant rooms without ventilation and fire watch
- DON'T store flammable materials, solvents, or gas cylinders inside operating plant rooms
- DON'T leave floor penetrations uncovered or unguarded in the plant room during works
- DON'T attempt to move heavy equipment without a planned lifting or rigging operation
- DON'T work near energised switchgear during commissioning without arc-rated PPE and authority
- DON'T block emergency exits or access routes with equipment, materials, or waste
- DON'T use solvent-based products in unventilated plant rooms — fumes accumulate rapidly
- DON'T enter the plant room without hearing protection if equipment is running above 85 dB(A)
- DON'T ignore trade coordination — clashes in congested spaces lead to damage and injuries