- Install edge protection on all bridge decks, abutments, and elevated work areas.
- Ensure falsework and formwork have a valid design check and permit to load.
- Follow the approved lift plan for all beam and girder installation operations.
- Maintain exclusion zones beneath bridge construction areas to protect workers below.
- Coordinate with highways or railway authorities when working over live infrastructure.
- Use harness and lanyard systems where edge protection cannot be installed at leading edges.
- Brief all workers on the bridge construction sequence and phasing each day.
- Monitor temporary works for movement, deflection, or signs of distress during construction.
- Follow post-tensioning safe working procedures and maintain exclusion zones during stressing.
- Ensure permanent and temporary works designers coordinate on stability at every stage.
|
- DON'T work on bridge decks or abutments without edge protection or fall arrest systems.
- DON'T load falsework before the design check is complete and the permit is issued.
- DON'T lift beams or girders without a detailed lift plan briefed to all involved.
- DON'T work beneath bridge construction without exclusion zones to protect from falling objects.
- DON'T work over live traffic or railways without the required protection and coordination.
- DON'T rely solely on harnesses where collective edge protection could be installed instead.
- DON'T skip daily briefings — bridge construction hazards change with each phase of work.
- DON'T ignore signs of falsework distress such as deflection, creaking, or misalignment.
- DON'T enter the exclusion zone during post-tensioning stressing operations.
- DON'T proceed with construction if there are unresolved queries between designers.
See also: Bridge Deck Construction | Precast Beam Installation
|