- Appoint a temporary works coordinator before bridge temporary works begin.
- Ensure all designs are independently checked before installation starts.
- Record every temporary works scheme in the temporary works register.
- Inspect falsework foundations for level, stability, and adequate bearing.
- Follow the agreed loading sequence during concrete pours exactly as designed.
- Obtain formal approval from the TWC before striking any falsework.
- Inspect falsework during and immediately after each concrete pour.
- Confirm the permanent structure has reached design strength before striking.
- Brief all operatives on the pour sequence and any loading restrictions.
- Report any sign of settlement, deflection, or distortion in falsework immediately.
|
- DON'T install falsework without a checked and approved temporary works design.
- DON'T strike falsework without formal approval from the TWC.
- DON'T alter the loading sequence without designer and TWC agreement.
- DON'T place falsework on ground that has not been assessed for bearing.
- DON'T overload falsework by exceeding the concrete pour volumes in the design.
- DON'T ignore signs of settlement, deflection, or member distortion in falsework.
- DON'T allow unapproved modifications to any part of the temporary works.
- DON'T assume striking is safe because the concrete looks hard enough.
- DON'T skip the independent design check — this is a non-negotiable requirement.
- DON'T begin work under or on falsework without confirming the permit status.