- Erect temporary works to approved designs checked by the TWC before loading
- Install fall protection for all work on abutment walls and pier columns
- Brief crews on the planned sequence for excavation, rebar, formwork, and pour
- Coordinate traffic management or rail possessions before working near live routes
- Monitor ground conditions and dewatering systems throughout construction
- Confirm concrete cube strength before authorising any formwork striking
- Use exclusion zones and banksmen during lifting operations at pier locations
- Inspect cofferdams and sheet piling daily when working in or near water
- Record all temporary works inspections in the site register
- Ensure access platforms provide safe working positions for all trades
|
- DON'T strike formwork before the concrete has reached the required strength
- DON'T load temporary works beyond the design capacity at any stage
- DON'T fix reinforcement at height without harnesses or working platforms
- DON'T pour concrete without confirming the formwork has been inspected and approved
- DON'T work over live traffic or railways without agreed protection measures
- DON'T ignore water ingress into excavations — maintain dewatering at all times
- DON'T allow unauthorised modifications to formwork or falsework systems
- DON'T enter cofferdams without checking the rescue plan and atmospheric conditions
- DON'T store materials on access scaffolds unless the design permits additional loading
- DON'T skip daily inspections of temporary works during the construction phase