- Follow the fill placement specification exactly for layer thickness and moisture content.
- Compact each layer to the required density and test before placing the next layer.
- Maintain safe gradients on haul roads and restrict plant to approved routes on slopes.
- Wear a personal flotation device when working near the impounding reservoir.
- Place filter and drainage zones in the exact sequence shown on the design drawings.
- Protect exposed clay core from rainfall with sheeting when work stops.
- Report any seepage, wet patches, or unusual conditions on the embankment face.
- Follow the supervising engineer instructions for all construction stage inspections.
- Record all compaction test results and layer placement data for the dam safety file.
- Maintain rescue equipment at the reservoir edge throughout the construction period.
|
- DON'T place fill material that does not meet the specified moisture content range.
- DON'T skip compaction testing on any layer before placing the next one above.
- DON'T operate heavy plant on embankment slopes steeper than the approved gradient.
- DON'T work near the reservoir without a personal flotation device.
- DON'T place filter or drainage material out of the designed sequence.
- DON'T leave the clay core exposed to rain without protective covering.
- DON'T ignore seepage, wet patches, or soft areas appearing on the embankment.
- DON'T deviate from the supervising engineer instructions without formal approval.
- DON'T use unsuitable fill material that has not been tested and approved.
- DON'T rush construction to meet programme at the expense of specification compliance.
See also: Dam and Reservoir Safety Awareness | Earthworks Compaction
|