- Commission a pre-demolition survey by a competent and experienced person.
- Identify the structural system and how the building maintains its stability.
- Complete an asbestos R&D survey before any stripping or demolition.
- Identify and disconnect all services — gas, electric, water, and telecoms.
- Assess the impact of demolition on adjacent buildings and shared structures.
- Use the survey findings to develop the demolition method statement.
- Identify pre-stressed or post-tensioned elements for specialist treatment.
- Include the survey report in the pre-construction information pack.
- Review the survey if conditions change before demolition starts.
- Record all findings and distribute to the demolition contractor team.
|
- DON'T begin demolition without a completed pre-demolition survey.
- DON'T demolish any structure before asbestos has been surveyed and managed.
- DON'T assume services are disconnected — confirm with each utility provider.
- DON'T demolish party walls or shared structures without specialist advice.
- DON'T cut pre-stressed elements without a safe release plan.
- DON'T skip the survey for smaller buildings — the same hazards apply.
- DON'T rely on original construction drawings — verify actual conditions.
- DON'T ignore basement voids, cellars, or below-ground structures.
- DON'T allow the sequence to deviate from the method statement.
- DON'T start before all service disconnections are confirmed in writing.