- Install trench support or bat the sides before anyone enters the excavation
- Provide safe access and egress points at maximum 15 metre intervals
- Inspect the trench at the start of each shift and after any rainfall
- Clear all workers from the trench before lowering pipes with plant
- Use mechanical aids to handle and position heavy pipes where practicable
- Locate and mark all existing buried services before and during excavation
- Place bedding and sidefill material carefully to avoid pipe damage
- Deploy traffic management where the trench is adjacent to a live highway
- Brief the pipe laying team on the trench support type and inspection findings
- Keep spoil heaps at least 1.5 metres back from the trench edge
|
- DON'T enter an unsupported trench deeper than 1.2 metres under any circumstances
- DON'T remain in the trench while pipes are being lowered by machine
- DON'T stockpile spoil, materials, or plant close to the trench edge
- DON'T work in a trench without a means of escape within 15 metres
- DON'T dig without checking for buried services using CAT, Genny, and plans
- DON'T compact backfill directly over the pipe crown without protective cover
- DON'T lift heavy pipes manually without a handling assessment and aids
- DON'T continue working in a trench showing signs of cracking or bulging walls
- DON'T leave the trench open and unguarded at the end of the working day
- DON'T skip the daily trench inspection even if conditions appear unchanged