- Locate all buried services before starting vibro installation at each column position
- Set up the crane on a stable platform designed for the imposed dynamic loads
- Maintain exclusion zones around the vibroflot during penetration and extraction
- Install vibration monitors on adjacent structures before work commences
- Manage water discharge and spoil flows in accordance with environmental permit conditions
- Record installation data including depth, stone consumption, and power readings for each column
- Wear hearing protection when working near the vibroflot during operation
- Brief the installation team on the planned column layout and specific site hazards
- Monitor vibration levels at sensitive receptors and stop if trigger values are reached
- Maintain the crane in accordance with LOLER and the manufacturer service schedule
|
- DON'T install stone columns over unlocated buried services
- DON'T stand within the exclusion zone while the vibroflot is operating
- DON'T exceed vibration trigger levels at adjacent structures without stopping and reviewing
- DON'T set up the crane on ground that has not been assessed for bearing capacity
- DON'T discharge process water without treatment or environmental permit compliance
- DON'T skip installation data recording — it is essential for quality verification
- DON'T operate without hearing protection near the vibroflot and crane
- DON'T allow the vibroflot to swing uncontrolled when being lifted or repositioned
- DON'T continue if the crane shows signs of instability during dynamic loading
- DON'T ignore changes in ground conditions that may indicate voids or obstructions below