- Follow LOTO procedures for all work on mechanical and electrical equipment.
- Complete pre-commissioning checklists before any system is energised for the first time.
- Use a lift plan for all heavy equipment installation including pumps, motors, and valves.
- Ensure electrical connections are made only by qualified, competent electricians.
- Carry out pressure tests in accordance with the approved test procedure and exclusion zones.
- Communicate with other trades before starting work that may affect shared systems.
- Wear the correct PPE for the task including gloves, eye protection, and hearing protection.
- Follow COSHH procedures when handling chemicals for dosing systems or treatment processes.
- Attend commissioning briefings and understand the energisation sequence for your area.
- Report any equipment damage, incorrect specifications, or installation concerns immediately.
|
- DON'T work on any MEICA equipment without confirming proper LOTO isolation is in place.
- DON'T energise systems without completing and signing off all pre-commissioning checks.
- DON'T lift heavy equipment without a written lift plan and competent slinger in place.
- DON'T carry out electrical work unless you are a qualified, authorised electrician.
- DON'T stand in the line of fire during pressure tests — use designated exclusion zones.
- DON'T work on interconnected systems without coordinating with other trades first.
- DON'T remove PPE during MEICA installation — hazards change rapidly as work progresses.
- DON'T handle dosing chemicals without reading the COSHH assessment and data sheet.
- DON'T bypass commissioning procedures or skip steps to save time.
- DON'T assume a system is dead — prove isolation and test before every intervention.