- Confirm the piling platform is designed, approved, and adequate before the rig arrives.
- Scan for and confirm the absence of buried services along the pile line before boring.
- Ensure the rig is level and stable before starting each pile bore.
- Maintain exclusion zones around the operating rig and concrete pump at all times.
- Clear auger spoil regularly to maintain safe access and rig stability.
- Use a banksman to guide concrete wagons approaching the pump and rig area.
- Install reinforcement cages into wet concrete immediately using the approved method.
- Wear hearing protection within the designated noise zone around the piling rig.
- Follow the concrete pump pressure procedures and maintain pipeline integrity.
- Hold valid CPCS or equivalent certification before operating the CFA piling rig.
|
- DON'T allow a CFA rig onto an unapproved or inadequately constructed piling platform.
- DON'T bore piles without confirming buried services are clear along the pile line.
- DON'T operate the rig on an unlevel or unstable surface — reposition before boring.
- DON'T enter the exclusion zone around the rig or pump during piling operations.
- DON'T let spoil accumulate around the rig — clear it continuously during boring.
- DON'T allow concrete wagons near the rig without banksman control.
- DON'T delay cage installation — reinforcement must be placed while concrete is fresh.
- DON'T work near the CFA rig without hearing protection in the noise zone.
- DON'T ignore pump pressure readings — abnormal values indicate a blockage or failure.
- DON'T operate a CFA rig without the required CPCS or equivalent competency card.