- Ensure the piling platform is designed, constructed, and inspected before any rig setup
- Verify all buried services are located and marked before boring any pile position
- Establish and enforce exclusion zones around the piling rig during all operations
- Use a planned lifting operation for placing reinforcement cages into the bore
- Monitor adjacent structures for movement using pre-installed survey points
- Check bore alignment and depth against the design at each pile position
- Manage spoil arisings safely and test for contamination before disposal
- Confirm concrete supply and tremie arrangements before starting each pile bore
- Maintain communication between the rig operator, banksman, and site supervisor
- Record as-built pile positions, depths, and concrete volumes for every pile installed
|
- DON'T set up the piling rig on ground that has not been assessed for bearing capacity
- DON'T enter the exclusion zone while the piling rig is operating or moving
- DON'T leave open bore holes unguarded — they are a fall hazard to personnel
- DON'T lift reinforcement cages without an approved lift plan and exclusion zone
- DON'T ignore signs of ground movement or cracking on adjacent structures
- DON'T bore near live services without hand-dug trial holes confirming their positions
- DON'T pour concrete into a bore without verifying the cage is at the correct depth
- DON'T allow spoil to accumulate around the rig where it obstructs safe access
- DON'T carry out piling without the temporary works design approval in place
- DON'T operate the rig near overhead power lines without a safe approach distance
See also: Piling Safety Awareness | Piling Platform Requirements
|