- Locate all existing services along the full drill path before starting the pilot bore.
- Maintain exclusion zones around the drill rig, entry pit, and exit pit at all times.
- Monitor the drill path using tracking equipment throughout the pilot bore operation.
- Establish exclusion zones along the pullback path during high-tension pipe installation.
- Contain and collect bentonite drilling fluid returns — do not allow them to enter drains.
- Support and barrier entry and exit pit excavations as required for open excavations.
- Brief the team on the drill path, service locations, and emergency procedures daily.
- Wear the correct PPE including hearing protection near the operating drill rig.
- Hold valid training and competency certification before operating the HDD drill rig.
- Report any unexpected drilling fluid returns surfacing away from the bore path.
|
- DON'T start drilling without locating all buried services along the planned bore path.
- DON'T enter exclusion zones around the drill rig or pits during active operations.
- DON'T proceed with the pilot bore without tracking the drill head position continuously.
- DON'T stand in the pullback path — pipe whip from a failed connection is lethal.
- DON'T allow drilling fluid to discharge into drains or watercourses uncollected.
- DON'T leave entry and exit pit excavations unsupported or without edge protection.
- DON'T skip the daily briefing on drill path, hazards, and emergency procedures.
- DON'T work near the drill rig without appropriate hearing and eye protection.
- DON'T operate HDD equipment without valid competency training and certification.
- DON'T ignore unexpected surface returns of drilling fluid — investigate the cause immediately.
See also: Pipeline Safety Awareness | CAT & Genny Safe Use
|