- Set up the pump on firm ground with outriggers fully extended on spreader plates.
- Check for overhead power lines before positioning the pump and extending the boom.
- Establish exclusion zones beneath and around the operating boom radius.
- Control the discharge hose at all times using a trained operative at the end.
- Maintain continuous communication between pump operator and placing gang.
- Hold a valid CPCS concrete pump card before operating the equipment.
- Mark and protect pipeline routes across the site to prevent trip hazards.
- Stop pumping and relieve pressure safely if a pipeline blockage is suspected.
- Clean the pipeline under controlled conditions after the pour is complete.
- Brief the team on exclusion zones, communication signals, and emergency stops.
|
- DON'T set up the pump on soft ground or slopes without full outrigger deployment.
- DON'T position the pump boom near overhead power lines without a risk assessment.
- DON'T allow anyone beneath the boom or within the exclusion zone during pumping.
- DON'T let the discharge hose operate without a trained person controlling it.
- DON'T pump without clear communication between the operator and placing gang.
- DON'T operate a concrete pump without the required CPCS competency card.
- DON'T leave pipeline routes unmarked where people could trip over them.
- DON'T look into or stand in front of a blocked pipeline under pressure.
- DON'T rush the pipeline cleanout — it involves pressurised water and residual concrete.
- DON'T begin pumping without briefing the team on exclusion zones and emergency stops.