Concrete Pump Safety

Toolbox Talk Record

Ref: TBT-PLT-007  |  Issue: 1  |  Date: March 2026
PresenterProject
LocationDate

What?

Why?

Pipeline pressureA blocked pipeline under pump pressure stores enormous energy — sudden release propels concrete and fittings with lethal force.
Hose whipThe discharge hose moves with extreme force as concrete flows — an uncontrolled hose has struck and killed workers at the pour.
Boom setupThe boom and outrigger system behaves like a crane — incorrect setup on soft ground or slopes causes catastrophic overturn.
Do Don't
  • Set up the pump on firm ground with outriggers fully extended on spreader plates.
  • Check for overhead power lines before positioning the pump and extending the boom.
  • Establish exclusion zones beneath and around the operating boom radius.
  • Control the discharge hose at all times using a trained operative at the end.
  • Maintain continuous communication between pump operator and placing gang.
  • Hold a valid CPCS concrete pump card before operating the equipment.
  • Mark and protect pipeline routes across the site to prevent trip hazards.
  • Stop pumping and relieve pressure safely if a pipeline blockage is suspected.
  • Clean the pipeline under controlled conditions after the pour is complete.
  • Brief the team on exclusion zones, communication signals, and emergency stops.
  • DON'T set up the pump on soft ground or slopes without full outrigger deployment.
  • DON'T position the pump boom near overhead power lines without a risk assessment.
  • DON'T allow anyone beneath the boom or within the exclusion zone during pumping.
  • DON'T let the discharge hose operate without a trained person controlling it.
  • DON'T pump without clear communication between the operator and placing gang.
  • DON'T operate a concrete pump without the required CPCS competency card.
  • DON'T leave pipeline routes unmarked where people could trip over them.
  • DON'T look into or stand in front of a blocked pipeline under pressure.
  • DON'T rush the pipeline cleanout — it involves pressurised water and residual concrete.
  • DON'T begin pumping without briefing the team on exclusion zones and emergency stops.