- Follow the temporary works design for kentledge weight, position, and stacking.
- Assess ground bearing capacity before placing kentledge at any location.
- Use a lift plan for placing and removing kentledge blocks with the crane.
- Stack blocks on level surfaces using interlocking arrangements to prevent toppling.
- Register the kentledge scheme in the temporary works register with TWC approval.
- Establish exclusion zones during kentledge placement and removal crane operations.
- Inspect kentledge position and stability regularly during the temporary works period.
- Remove kentledge in the sequence specified by the temporary works design.
- Verify the total weight placed matches the design requirement before loading the structure.
- Brief the team on the kentledge layout and the importance of maintaining positions.
|
- DON'T use less kentledge than the temporary works design specifies.
- DON'T position kentledge in locations different from those shown on the design.
- DON'T stack blocks on soft or uneven ground without checking bearing capacity.
- DON'T remove kentledge before the TWC authorises removal in the designed sequence.
- DON'T stand under kentledge blocks being lifted, placed, or adjusted by crane.
- DON'T stack blocks in unstable arrangements without interlocking or restraint.
- DON'T guess the weight needed; use only the amount specified in the design.
- DON'T use kentledge without registering it as a temporary works scheme.
- DON'T allow other trades to move or remove kentledge blocks from position.
- DON'T substitute different block types without checking the weight matches the design.