- Hold valid gas network competencies before carrying out any gas main installation work.
- Support all trenches in accordance with the method statement and ground conditions.
- Locate and maintain safe distances from existing live gas mains along the route.
- Use calibrated fusion equipment and hold current certification for the jointing method.
- Eliminate all ignition sources during gas purging and commissioning operations.
- Establish exclusion zones around purge vent points during commissioning procedures.
- Pressure test completed sections to the specification before commissioning with gas.
- Install compliant traffic management before opening any excavation in the highway.
- Reinstate excavations to SROH specification to prevent road surface failures.
- Carry a personal gas monitor throughout all gas main installation work.
|
- DON'T carry out gas main installation without valid gas network competency qualifications.
- DON'T work in unsupported gas main trenches in highways or variable ground.
- DON'T machine dig within 500mm of a live gas main — hand dig within this zone.
- DON'T operate fusion equipment without current certification and calibrated machines.
- DON'T use phones, radios, or create sparks during gas purging operations.
- DON'T allow anyone within the exclusion zone during gas purging and venting.
- DON'T commission a gas main without confirmed pressure test results to specification.
- DON'T start highway excavation without approved traffic management in place.
- DON'T backfill with incorrect materials — reinstatement failures cause highway defects.
- DON'T work on gas infrastructure without a calibrated personal gas monitor.