Bridges & Structures › Inspection Repair › Steel Bridge Erection
| Presenter | Project | ||
| Location | Date |
| Prevent collapse | Incorrect erection sequence or inadequate temporary bracing can cause catastrophic structural collapse. |
| Protect the public | Steel bridge erection over roads, railways, and waterways puts the travelling public at risk. |
| Legal compliance | LOLER 1998, CDM 2015, and Work at Height Regulations require formal planning for all bridge erection work. |
| Worker safety | Falls from height, crush injuries from heavy sections, and crane incidents are primary risks during erection. |
| Do | Don't |
|
See also: Steel Erection Safety | Bridge Construction Safety Awareness |