Construction & Civil Engineering

Professional Excel Templates Built by Industry Experts

Save hours every week with ready-to-use spreadsheets designed for UK site managers, civil engineers, and project teams working to CDM 2015 and British Standards. Instant download, no signup required.

Templates from £9.99

Browse all templates ↓
★★★★★4.9/5 average rating•Trusted by 500+ construction professionals•Instant download•Windows & Mac compatible

Featured Templates

Outstanding Work List Excel snagging register with 1200 item capacity overdue ageing and walkdown viewsOWL List previewInspection & TestingNEW

OWL List

Outstanding Work List (snagging/defect register) with 1,200+ item capacity, tracking each item by area, sub-area, discipline (Civils/EICA/Mechanical), category, company and responsible individual - with agreed and revised close-out dates, days open and overdue calculations, a live dashboard with open/closed totals, overdue ageing bands (0–30, 31–60, 61–90, 90+ days), and an interactive person-based filter view for targeted walkdown follow-up.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Excavation Inspection Register Excel template with 75 questions depth band risk escalation and RAG dashboardExcavation Inspection Register previewInspection & Testing

Excavation Inspection Register

VBA-powered excavation inspection and compliance management system with an excavation register (5 types: trench, pit, shaft, bulk dig, confined space), a 75-question type-specific inspection form (15 questions per excavation type) with auto-populated details, automatic depth-band risk escalation (Standard/Enhanced/High/Critical) with mandatory controls and reference standards (HSG185, BS 6031, BS 5975, CDM 2015, CS Regs 1997), RAG inspection outcomes (Pass/Conditional Pass/Fail), a timestamped inspection register with locked rows, a dashboard with excavation and inspection KPIs plus depth band breakdowns, and one-click PDF export in A4 and A3 formats.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Supervisors RACI Chart Excel template with task mapping person profiles and duty acknowledgementSupervisor's RACI Chart previewProject ManagementNEW

Supervisor's RACI Chart

Supervisory RACI wall chart mapping key site tasks (safety checks, inspections, RAMS reviews, logistics, quality, environmental, commissioning) to named team members using R/A/C/I assignments with review frequency and estimated hours per task, a Person Profile sheet calculating each individual's monthly hour allocation and days used/free across the calendar year, and a signature sheet for formal acknowledgement of duties.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Gantt Chart Project Planner Excel template with critical path dependencies resource loading and dashboardGantt Chart Project Planner previewProject Management

Gantt Chart Project Planner

VBA-enabled Gantt chart with a 4-level WBS hierarchy (Phase, Sub-Phase, Task, Sub-Task), 5 switchable timescale views (daily, weekly, fortnightly, monthly, quarterly), dependency management (FS/SS/FF/SF with lag support), automatic critical path calculation with float values, baseline capture and comparison, a working days calendar with pre-loaded UK bank holidays and custom non-working days, resource loading histograms by owner, a dashboard with programme KPIs, phase progress, upcoming milestones, overdue task tracking and an S-curve, plus one-click A3 landscape PDF export.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

All Templates (45)

Gantt Chart Project Planner Excel template with critical path dependencies resource loading and dashboardGantt Chart Project Planner previewProject Management

Gantt Chart Project Planner

VBA-enabled Gantt chart with a 4-level WBS hierarchy (Phase, Sub-Phase, Task, Sub-Task), 5 switchable timescale views (daily, weekly, fortnightly, monthly, quarterly), dependency management (FS/SS/FF/SF with lag support), automatic critical path calculation with float values, baseline capture and comparison, a working days calendar with pre-loaded UK bank holidays and custom non-working days, resource loading histograms by owner, a dashboard with programme KPIs, phase progress, upcoming milestones, overdue task tracking and an S-curve, plus one-click A3 landscape PDF export.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Excavation Inspection Register Excel template with 75 questions depth band risk escalation and RAG dashboardExcavation Inspection Register previewInspection & Testing

Excavation Inspection Register

VBA-powered excavation inspection and compliance management system with an excavation register (5 types: trench, pit, shaft, bulk dig, confined space), a 75-question type-specific inspection form (15 questions per excavation type) with auto-populated details, automatic depth-band risk escalation (Standard/Enhanced/High/Critical) with mandatory controls and reference standards (HSG185, BS 6031, BS 5975, CDM 2015, CS Regs 1997), RAG inspection outcomes (Pass/Conditional Pass/Fail), a timestamped inspection register with locked rows, a dashboard with excavation and inspection KPIs plus depth band breakdowns, and one-click PDF export in A4 and A3 formats.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Outstanding Work List Excel snagging register with 1200 item capacity overdue ageing and walkdown viewsOWL List previewInspection & TestingNEW

OWL List

Outstanding Work List (snagging/defect register) with 1,200+ item capacity, tracking each item by area, sub-area, discipline (Civils/EICA/Mechanical), category, company and responsible individual - with agreed and revised close-out dates, days open and overdue calculations, a live dashboard with open/closed totals, overdue ageing bands (0–30, 31–60, 61–90, 90+ days), and an interactive person-based filter view for targeted walkdown follow-up.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Supervisors RACI Chart Excel template with task mapping person profiles and duty acknowledgementSupervisor's RACI Chart previewProject ManagementNEW

Supervisor's RACI Chart

Supervisory RACI wall chart mapping key site tasks (safety checks, inspections, RAMS reviews, logistics, quality, environmental, commissioning) to named team members using R/A/C/I assignments with review frequency and estimated hours per task, a Person Profile sheet calculating each individual's monthly hour allocation and days used/free across the calendar year, and a signature sheet for formal acknowledgement of duties.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Daily Diary Template Excel macro-enabled site diary with QS search dashboard and workforce chartsDaily Diary Template previewDaily Operations

Daily Diary Template

365-day macro-enabled site diary (.xlsm) with a dedicated sheet per day, weather AM/PM and temperature logging, visitor records, a 12-row workforce and activity log per date (subcontractor, trade, headcount, hours, delays, variations), consolidated All Diary Data view with hyperlinks, a filterable QS Search Dashboard with live KPIs (total hours, headcount, delay counts), and a Charts Dashboard for graphical workforce analysis.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Concrete Pour Register Excel template with cube test tracking BS EN 13670 strike analysis and strength curvesConcrete Pour Register previewConcrete & Materials

Concrete Pour Register

Full concrete pour register and cube test record with BS EN 13670 compliant formwork strike analysis - featuring dynamic strike planning by mix, pour type and temperature band, UKAS-method strength gain curves with confidence envelopes, a programme dashboard with RAG status and pass rates, and configurable concrete mixes (OPC, PFA and GGBS blends).

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Carbon Calculator Excel template with BS EN 15978 whole life carbon assessment ICE v3 factors and dashboardCarbon Calculator for Construction previewCost & Carbon Calculators

Carbon Calculator for Construction

BS EN 15978 compliant whole-life carbon assessment tool covering modules A1–A5 (embodied) and B1–B7 (operational) with a pre-loaded ICE Database v3.0 and BEIS/DESNZ emission factor library, material inputs by construction phase with auto-populated carbon factors, a transport emissions schedule (Module A4) with default UK distances and overrides, a plant and equipment hours log (Module A5), an operational carbon sheet (B1–B7), a side-by-side design option comparison, industry benchmarks by asset type, and a dashboard showing total tCO₂e by lifecycle module and construction phase.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Pump Maintenance Tracker Excel template with asset register task library and weekly schedule dashboardPump Maintenance Tracker previewWastewater & Utilities

Pump Maintenance Tracker

Pump maintenance planner with a pump register recording area, asset tag, duty status, manufacturer, model, commission date, criticality, pump type and runtime hours - linked to a configurable task library with calendar-based and runtime-based maintenance triggers, a printable weekly maintenance schedule (filterable by area and week), and a dashboard showing total pumps, tasks due this week, due-now and due-soon counts.

Included in paid plans
View DetailsBuy Now

🔒 Secure checkout via Gumroad

Why Choose Ebrora

🛠️

Built for Construction

Templates designed by construction professionals who understand your workflows and compliance needs.

⚡

Instant Download

Get immediate access to all templates. Start using them in minutes, not hours.

🔒

Professional & Reliable

Industry-standard Excel templates trusted by hundreds of construction companies across the UK.

💻

Windows & Mac

All templates are fully compatible with Excel on Windows, Mac, and Google Sheets.