EXC/General/TBT-EXC-006

Excavation Inspection Requirements

ExcavationsGeneralExcavation Inspection Requirements

All Categories/Excavations/General/Excavation Inspection Requirements

Excavation Inspection Requirements

Toolbox Talk Record

Ref: TBT-EXC-006  |  Issue: 1  |  Date: March 2026
PresenterProject
LocationDate

What?

  • Excavation inspections are a legal requirement under the Work at Height Regulations 2005 Schedule 3 and CDM 2015.
  • Inspections must be carried out by a competent person with sufficient training, knowledge, and experience in excavation hazards.
  • Every excavation must be inspected before any person enters it for the first time on any working day.
  • Inspections must also occur at the start of every shift where work is ongoing and after any event affecting stability.
  • Events triggering an additional inspection include heavy rain, flooding, frost, vibration from plant, and any ground movement.
  • The inspection must check the excavation support system, ground conditions, access and egress, and edge protection.
  • Water ingress, cracking of the ground surface, and bulging of trench walls are signs of imminent collapse requiring immediate action.
  • Inspection results must be recorded in writing and kept available on site for review by the HSE or client.
  • Reports must be completed before the end of the working period in which the inspection was carried out.
  • The competent person has the authority to stop work and evacuate the excavation if conditions are unsafe.

Why?

Prevent burialInspections catch deteriorating conditions before they cause collapse — ground conditions change faster than most people expect.
Legal requirementWork at Height Regulations Schedule 3 requires inspection before first use, every shift, and after adverse events — with written records.
Authority to stopThe competent inspector has the authority and responsibility to evacuate the excavation if any concern about stability exists.
Do Don't
  • Inspect every excavation before any person enters it at the start of each day.
  • Carry out additional inspections at every shift change during continuous operations.
  • Re-inspect after heavy rain, flooding, frost, vibration, or any ground movement.
  • Check the support system, ground conditions, access, egress, and edge protection.
  • Look for water ingress, surface cracking, and wall bulging as signs of instability.
  • Record inspection results in writing before the end of the working period.
  • Keep inspection reports on site and available for HSE or client review.
  • Use only competent persons with excavation knowledge to carry out formal inspections.
  • Stop work and evacuate the excavation if any unsafe condition is identified.
  • Brief the excavation team on the inspection findings before they enter.
  • DON'T allow anyone into an excavation that has not been inspected that day.
  • DON'T skip the shift-change inspection on continuous excavation operations.
  • DON'T enter an excavation after heavy rain without a re-inspection by a competent person.
  • DON'T limit the inspection to a glance — systematically check supports, walls, and access.
  • DON'T ignore cracking, bulging, or water seepage — they indicate imminent collapse.
  • DON'T delay recording the inspection — complete the report before the shift ends.
  • DON'T lose inspection records — they must be available on site for review.
  • DON'T allow unqualified persons to carry out formal excavation inspections.
  • DON'T override the inspector's decision to stop work — the excavation must be evacuated.
  • DON'T assume yesterday's inspection is valid today — conditions change overnight.

See also: Excavation Safety Awareness | Trench Collapse Prevention