Working Over or Near Water Method Statement Cover
Free Word template: Working Over or Near Water Method Statement Cover. Download for UK construction sites.

Download Working Over or Near Water Method Statement Cover
Word format · 15.8 KB · Free with account
What’s inside this template
The Working Over or Near Water Method Statement Cover Word document - taken from the file itself.
Sections
- Work Details
- Pre-Work Checklist
- Rescue Plan Summary
Table 1 columns
- No.
- Pre-Work Check Item
- Yes
- No
- N/A
Table 2 columns
- Rev
- Date
- Description of Change
- Author
- Approved By
References: CDM 2015, MHSW Regs 1999, HSE EIS40, BS EN ISO 12402 (buoyancy aids/life jackets), Water Resources Act 1991, EA Environmental Permitting Regs, CIRIA C624