BRD/General/TBT-BRD-001
Bridge Construction Safety Awareness
Bridges & Structures › General › Bridge Construction Safety Awareness
Bridge Construction Safety Awareness
Toolbox Talk Record
Ref: TBT-BRD-001 | Issue: 1 | Date: March 2026
| Presenter | Project | ||
| Location | Date |
What?
- Bridge construction combines working at height, heavy lifting, temporary works, and traffic management into a single operation.
- Falls from bridge decks, abutments, and falsework are a primary cause of serious injuries during bridge construction.
- Temporary works including falsework, propping, and temporary bearings are critical to structural stability during construction.
- Precast beam installation involves complex lifting operations with heavy loads, requiring detailed lift plans under LOLER.
- Working over or adjacent to live traffic, railways, or waterways adds significant additional hazard to bridge construction.
- Formwork for in-situ bridge decks must be designed, checked, and inspected with a permit to load before concrete is poured.
- Post-tensioning operations involve high-tension cables and specialist equipment that can cause catastrophic injury if they fail.
- Bridge bearing installation requires precision placement of heavy components in confined spaces at height.
- Waterproofing, expansion joints, and parapet construction involve working at the exposed edges of completed bridge decks.
- Coordination between the permanent works designer and the temporary works coordinator is essential for structural safety.
Why?
| Prevent fatal falls | Bridge decks, abutments, and falsework create exposed working at height — edge protection and harness systems are essential throughout. |
| Temporary works failure | Falsework collapse during bridge construction causes catastrophic structural failure — proper design, checking, and inspection are mandatory. |
| Complex lifting | Precast beams and steel girders are among the heaviest single lifts on construction sites — detailed planning prevents dropped loads. |
| Do | Don't |
|
See also: Bridge Deck Construction | Precast Beam Installation |