Tidal Working Window Procedures
Marine & Coastal Works › General › Tidal Working Window Procedures
Tidal Working Window Procedures
Marine and coastal construction work is often restricted to tidal windows when the tide is low enough to expose the work area. Operatives must complete their tasks and evacuate before the rising tide floods the work zone. Misjudging the tidal window or failing to monitor water levels has led to workers becoming trapped, stranded, or drowned. This talk covers the procedures for safe working within tidal windows.
- Calculate the safe working window from published tide tables with an appropriate safety margin.
- Brief all operatives on the start and finish time of the tidal window before each shift.
- Appoint a dedicated tide watcher to monitor water levels and give early warning of the rising tide.
- Set a mandatory withdrawal time that allows sufficient margin for safe evacuation of all personnel.
- Establish and clearly mark the escape route from the tidal work area to high ground.
- Ensure all workers near tidal water wear personal flotation devices throughout the shift.
- Remove all plant, equipment, and materials from the tidal zone before the tide returns.
- Carry out a head count when all personnel have withdrawn from the tidal work area.
- Never extend the working window beyond the agreed time regardless of work pressure.
If anyone becomes trapped by the rising tide, call 999 and request the Coastguard immediately. Do not attempt a rescue in tidal water unless trained and equipped. Throw a lifebuoy if the person is within range. Account for all personnel at the muster point.
- Never extend the tidal working window beyond the agreed safe time under any circumstances
- A dedicated tide watcher must monitor water levels and give early warning throughout
- Know the escape route from the tidal zone to high ground before starting work
- Wear a personal flotation device at all times when working in the tidal zone
- Carry out a head count when all personnel have withdrawn to confirm everyone is safe
RAMS Builder
Generate professional Risk Assessment and Method Statements in minutes. 10 document formats, site-specific content, instant Word download.