MEC/Electrical/TBT-MEC-015
Control Panel Installation
MEICA Works › Electrical › Control Panel Installation
Control Panel Installation
Toolbox Talk Record
Ref: TBT-MEC-015 | Issue: 1 | Date: March 2026
| Presenter | Project | ||
| Location | Date |
What?
- Control panels house electrical switchgear, PLCs, and instrumentation that operate process equipment.
- Panels may contain low voltage (LV) and extra-low voltage (ELV) circuits within the same enclosure.
- Installation involves lifting heavy enclosures, cable termination, and connection to live supplies.
- BS 7671 (IET Wiring Regulations) and BS EN 61439 set the standards for panel installation in the UK.
- Incorrect wiring or termination can cause arc flash, fire, or uncontrolled equipment start-up.
- Many control panels are installed in confined plant rooms with limited access and ventilation.
- Panels must be securely fixed to floors or walls with anti-vibration mounts where required.
- Cable entries must be sealed to maintain the panel's IP rating and prevent vermin ingress.
- Commissioning and energisation must only take place after full inspection and testing by a competent person.
- Work on or near energised panels is prohibited unless a specific safe system of work is in place.
Why?
| Prevent electrocution | Incorrect connections or working on live circuits can cause fatal electric shock or severe burns. |
| Avoid arc flash | Short circuits inside panels can produce explosive arc flash events with temperatures exceeding 15,000°C. |
| Ensure reliable operation | Poor installation causes nuisance tripping, equipment damage, and process failures after handover. |
| Legal compliance | The Electricity at Work Regulations 1989 require all electrical work to be carried out safely by competent persons. |
| Do | Don't |
|
See also: Electrical Isolation | Cable Pulling and Termination |