Loading...
Products
Professional construction tools built by site teams, for site teams.
Loading...
Piling & Foundations › Types › Bored Pile Installation (CFA)
| Presenter | Project | ||
| Location | Date |
| Rig stability | A CFA rig overturning during boring or lifting a cage causes catastrophic crushing injuries — the piling platform is the foundation of safety. |
| Pressure hazards | Concrete pumped under high pressure through the auger stem can cause explosive pipeline failures if not properly controlled. |
| Spoil management | Auger spoil accumulates rapidly and creates trip hazards, buries services, and destabilises the rig if not cleared continuously. |
| Do | Don't |
|
See also: Piling Safety Awareness | Piling Platform Requirements |
Generate professional Risk Assessment and Method Statements in minutes. 10 document formats, site-specific content, instant Word download.