What?
- CFA (Continuous Flight Auger) piling involves drilling into the ground with a hollow-stemmed auger while injecting concrete on withdrawal.
- CFA rigs are large, heavy machines that require a designed and approved piling platform to operate safely.
- Concrete is pumped under pressure through the auger stem during extraction — the pipeline and pump create pressure hazards.
- Reinforcement cages are installed into the fresh concrete immediately after the auger is withdrawn from the pile bore.
- Spoil from the auger flights accumulates rapidly around the rig and must be cleared regularly to maintain safe access.
- The piling rig must be level and stable throughout the boring and concreting cycle to produce a structurally sound pile.
- Noise levels from CFA rigs are high — hearing protection zones must be established and maintained around the operation.
- Concrete delivery wagons accessing the pump require banksman control to prevent collision with the rig and workforce.
- Buried services along the pile line must be located and confirmed clear before any auger penetrates the ground.
- Only trained, competent CFA rig operators with valid CPCS or equivalent certification may carry out piling operations.
Why?
| Rig stability | A CFA rig overturning during boring or lifting a cage causes catastrophic crushing injuries — the piling platform is the foundation of safety. |
| Pressure hazards | Concrete pumped under high pressure through the auger stem can cause explosive pipeline failures if not properly controlled. |
| Spoil management | Auger spoil accumulates rapidly and creates trip hazards, buries services, and destabilises the rig if not cleared continuously. |
| Do | Don't |
|