ASB/Specific/TBT-ASB-010

Asbestos Analyst and Surveyor Roles

AsbestosSpecificAsbestos Analyst and Surveyor Roles

All Categories/Asbestos/Specific/Asbestos Analyst and Surveyor Roles

Asbestos Analyst and Surveyor Roles

Toolbox Talk Record

Ref: TBT-ASB-010  |  Issue: 1  |  Date: March 2026
PresenterProject
LocationDate

What?

  • Asbestos surveyors identify the location, type, and condition of asbestos-containing materials in buildings.
  • Asbestos analysts carry out air monitoring and four-stage clearance testing after asbestos removal work.
  • Both roles require UKAS accreditation and specific qualifications under the Control of Asbestos Regulations 2012.
  • A management survey identifies ACMs likely to be disturbed during normal building occupation and maintenance.
  • A refurbishment and demolition survey is more intrusive and must be completed before any refurbishment work.
  • The surveyor provides a register of ACMs with condition scores that determine the management priority.
  • Air monitoring during asbestos removal confirms fibre levels remain below the control limit of 0.1 f/ml.
  • The four-stage clearance process must be completed before the enclosure is dismantled and the area reoccupied.
  • Construction workers must not disturb materials until the asbestos survey confirms whether ACMs are present.
  • Duty holders must provide access for surveyors and share the asbestos register with all contractors on site.

Why?

Prevent exposureWithout a survey, workers unknowingly disturb hidden asbestos, inhaling fibres that cause fatal disease decades later.
Legal requirementThe Control of Asbestos Regulations 2012 require surveys before refurbishment and removal clearance by accredited analysts.
Clearance confidenceFour-stage clearance by an accredited analyst confirms the area is safe for reoccupation after asbestos removal.
Do Don't
  • Check the asbestos survey report before starting any intrusive work in a building.
  • Request a refurbishment and demolition survey if one has not been provided.
  • Provide full access to the surveyor for all areas of the building being assessed.
  • Share the asbestos register with all contractors and subcontractors on the project.
  • Use a UKAS-accredited analyst for air monitoring during all asbestos removal work.
  • Complete the four-stage clearance process before dismantling any asbestos enclosure.
  • Brief all workers on the ACM locations identified in the asbestos register.
  • Stop work and seek surveyor advice if suspected asbestos is found unexpectedly.
  • Keep the asbestos register available on site for reference throughout the project.
  • Update the register if new ACMs are identified during the construction works.
  • DON'T start refurbishment without a refurbishment and demolition asbestos survey.
  • DON'T disturb materials identified as ACMs without the correct removal procedures.
  • DON'T use a non-UKAS-accredited surveyor or analyst for asbestos work.
  • DON'T reoccupy an area after asbestos removal without four-stage clearance certification.
  • DON'T withhold the asbestos register from contractors working on the site.
  • DON'T assume no asbestos is present because the building looks modern or clean.
  • DON'T prevent the surveyor from accessing any area of the building for assessment.
  • DON'T dismiss a management survey as sufficient for refurbishment; a R and D survey is needed.
  • DON'T rely on a visual check alone; only laboratory analysis confirms asbestos content.
  • DON'T ignore the condition scores in the register; they dictate the urgency of action.

See also: Asbestos Awareness | Refurbishment and Demolition Surveys