DAM/General/TBT-DAM-001
Dam and Reservoir Safety Awareness
Dams, Reservoirs & Flood Defence › General › Dam and Reservoir Safety Awareness
Dam and Reservoir Safety Awareness
Toolbox Talk Record
Ref: TBT-DAM-001 | Issue: 1 | Date: March 2026
| Presenter | Project | ||
| Location | Date |
What?
- Dams and reservoirs are regulated structures where failure can cause catastrophic flooding and loss of life downstream.
- The Reservoirs Act 1975 requires all large raised reservoirs to be supervised by qualified civil engineers.
- Construction work on dams involves deep excavations, heavy earthworks, concrete placement, and working near deep water.
- Drowning is a primary hazard — reservoir construction involves open water, deep excavations, and steep embankments.
- Dam embankment construction requires precise compaction control — poor compaction can lead to internal erosion and failure.
- Spillway and outlet works construction involves confined spaces, deep chambers, and working near high-velocity water flows.
- Instrumentation installation on dams requires access to slopes, shafts, and valve towers, often at significant heights.
- Flood risk during construction must be managed — diversion channels and temporary cofferdams protect the works from inundation.
- Material delivery to dam sites involves large volumes of earthfill, creating intense heavy vehicle movements on haul roads.
- Dam construction projects are often in remote locations with limited emergency services access and communication coverage.
Why?
| Catastrophic failure risk | Dam failure releases millions of litres of water downstream — construction quality and safety directly protect communities below. |
| Drowning hazard | Deep water, steep slopes, and high-flow channels on dam sites create extreme drowning risk requiring constant water safety measures. |
| Remote location | Dam sites are often isolated — emergency response times are longer, making prevention and on-site first aid even more critical. |
| Do | Don't |
|
See also: Flood Defence Construction Safety | Embankment Dam Construction |
RAMS Builder