Temporary Works Coordinator Duties
Temporary Works › General › Temporary Works Coordinator Duties
Temporary Works Coordinator Duties
The Temporary Works Coordinator is a key role on any construction project that involves temporary structures such as formwork, propping, shoring, or falsework. They ensure that all temporary works are properly designed, checked, installed, monitored, and removed in a controlled manner. This talk explains the Coordinator's responsibilities and why every operative must understand their role in the temporary works process.
- Appoint a named Temporary Works Coordinator for every project involving temporary works.
- Ensure all temporary works are entered on the temporary works register before installation begins.
- Obtain design approval and an independent design check before any temporary works are erected.
- Inspect temporary works at the intervals specified in the design and record findings on the register.
- Issue a formal permit to load before any permanent works loads are applied to temporary structures.
- Never modify, alter, or remove temporary works without the Coordinator's written approval.
- Ensure the Coordinator briefs the installation team on the design requirements and sequence.
- Issue a formal permit to dismantle before any temporary works are struck or removed from site.
- Review the temporary works register at progress meetings to confirm all items are current.
- Every project with temporary works must have a named Temporary Works Coordinator appointed
- All temporary works must be registered, designed, checked, and approved before installation
- A permit to load is required before applying any permanent works loads to temporary structures
- Temporary works must never be modified or removed without the Coordinator's written approval
- A permit to dismantle must be issued before any temporary works are struck from site
- Regular inspections must be recorded on the temporary works register throughout the project