Aggregate Import Tracker

★★★★★4.9 out of 5
Included in paid plans

All prices include VAT where applicable

Included with every paid Ebrora plan, alongside the RAMS Builder, 35+ AI document tools, and Site Hub. Start free - no card needed.

CompatibilityWindows & Mac
Version1.0
File Size1.2 MB
Last UpdatedJune 2026
DeliveryInstant digital download via email
LicenceSingle user, lifetime access

Description

The Aggregate Import Tracker is an Excel-based delivery log for construction sites receiving bulk aggregate materials. Each delivery is recorded with date, supplier, material type, tonnage, weighbridge ticket reference and whether the material is recycled or virgin - enabling automatic CO₂e emissions calculations that distinguish between lower-carbon recycled aggregates and higher-carbon virgin materials.

Supplier performance summaries aggregate delivery data by supplier, showing total tonnage delivered, number of loads, average load size and reliability metrics. Monthly breakdowns present tonnage and carbon data side by side so project teams can report on both material usage and environmental impact in a single view.

The live dashboard surfaces programme-to-date KPIs including total tonnage received, recycled material share as a percentage, carbon intensity per tonne, cumulative CO₂e, and top supplier analysis by volume. The tracker is designed for site engineers, materials managers and environmental coordinators who need accurate delivery records for cost reporting, carbon reduction plans and SWMP compliance.

Key Features

✓ Per-delivery logging with date, supplier, material type and tonnage
✓ Automatic CO₂e emissions tracking for recycled vs virgin aggregates
✓ Weighbridge ticket referencing for auditable delivery records
✓ Supplier performance summaries with tonnage, loads and reliability metrics
✓ Monthly tonnage and carbon breakdowns for reporting
✓ Live dashboard with programme-to-date KPIs
✓ Recycled share percentage and carbon intensity per tonne calculations
✓ Top supplier analysis by volume delivered
✓ Supports SWMP compliance and carbon reduction plan reporting
✓ Designed for site engineers, materials managers and environmental coordinators

Need a Custom Version?

We can adapt any template to match your company's branding, workflows, or reporting requirements.

Get in Touch →