Ladder & Stepladder Permit

β˜…β˜…β˜…β˜…β˜…4.9 out of 5
Β£9.99

All prices include VAT where applicable

πŸ”’ You'll be taken to Gumroad.com to complete your purchase securely. Your Excel file will be delivered instantly to your email after payment.

CompatibilityWindows & Mac
Version1.0
File Size1.2 MB
Last UpdatedJune 2026
DeliveryInstant digital download via email
LicenceSingle user, lifetime access

Description

The Ladder & Stepladder Permit is a dynamic permit-to-work system built in Excel for construction sites that need to control and authorise the use of portable ladders and stepladders. It runs 16 automated compliance checks covering equipment type selection, stability and securing arrangements, user competence, maximum permitted duration, overhead hazards, weather exposure, and ground conditions, returning a live PASS, FAIL or WARN status for each check with specific remedial advice where issues are identified.

The permit follows a four-stage sign-off workflow: Initiation (the person requesting the permit), Authorisation (the supervisor or manager approving the work), Acceptor (the operative confirming understanding of controls), and Close-Out (confirmation the work is complete and the equipment removed). Each stage captures name, signature, date and time fields, providing a complete audit trail.

Designed around the Work at Height Regulations 2005 hierarchy of control, the system ensures ladders are only authorised where no safer alternative is reasonably practicable. The permit form is print-ready for site use and formatted for filing as part of your project safety documentation.

Key Features

βœ“ 16 automated compliance checks across equipment, stability, competence and hazards
βœ“ Live PASS, FAIL and WARN status with specific remedial advice for each check
βœ“ Four-stage sign-off workflow: Initiation, Authorisation, Acceptor, Close-Out
βœ“ Equipment type selection covering portable ladders and stepladders
βœ“ Stability and securing arrangement checks with condition assessment
βœ“ User competence verification and maximum duration controls
βœ“ Overhead hazard, weather exposure and ground condition checks
βœ“ Work at Height Regulations 2005 hierarchy of control alignment
βœ“ Print-ready permit form formatted for site use and audit filing
βœ“ Complete audit trail with name, signature, date and time at each stage

Need a Custom Version?

We can adapt any template to match your company's branding, workflows, or reporting requirements.

Get in Touch β†’