Loading...
Products
Professional construction tools built by site teams, for site teams.
Loading...
Working at Height › MEWPS › MEWP Pre-Use Checks
| Presenter | Project | ||
| Location | Date |
| Prevent boom failure | Hydraulic faults not caught during pre-use checks cause sudden boom drop or platform collapse at working height. |
| Emergency recovery | Testing the emergency lowering system confirms a stranded operator can be brought down safely if the main controls fail. |
| Legal requirement | PUWER and LOLER require pre-use inspection — operating an unchecked MEWP is a breach of health and safety law. |
| Do | Don't |
|
See also: Cherry Picker (Boom Lift) Safety | Scissor Lift Safety |
Generate professional Risk Assessment and Method Statements in minutes. 10 document formats, site-specific content, instant Word download.